 | ENGINEERING AND PUBLIC WORKS WATER/WASTEWATER MASTER PLAN |  |
Welcome
to the website for the King Township Water/Wastewater Master
Plans. Additional information about these studies can be viewed by clicking on
the following links:
STUDY BACKGROUND
The Water/Wastewater and
Stormwater Master Plans are infrastructure planning exercises that strive to
maximize the use of the Township’s current infrastructure, and identify where
and how additional capacity may be provided to address the needs of new
development areas outside of the current urban boundary, and redevelopment and
intensification within the built boundary.
Study Area
The Study Area for the Master Plans includes the communities of King City,
Nobleton, and Schomberg. The Ansnorveldt water system will also be reviewed.
Overall Class EA
The planning of major municipal projects or activities is subject to
the Ontario Environmental Assessment (EA) Act, R.S.O. 1990, and requires the
proponent to complete an Environmental Assessment, including an inventory and
description of the existing environment in the area affected by the proposed
activity.
The Class EA process was developed by the Municipal Engineers Association (MEA),
in consultation with the Ministry of the Environment (MOE), as an alternative
method to Individual Environmental Assessments for recurring municipal projects
that were similar in nature, usually limited in scale and with predictable
range of environmental effects which were responsive to mitigating measures.
Master Plans are long range plans which integrate infrastructure requirements
for existing and future land use with environmental assessment planning
principles. These plans examine an infrastructure system or group of related
projects in order to outline a framework for planning for subsequent projects
and/or developments. At a minimum, Master Plans address Phases 1 and 2 of the
Municipal Class EA process.
A flow chart describing the Class EA planning and design process is available in
the 'Notices and Information' section of this page.
Timelines
Notice
of Commencement: March 6, 2014.
Public
Information Centre #1: May 13, 2014
Public Information Center #2-Summer 2015
File EA report- Spring/Summer 2019
NOTICES AND
INFORMATION
The following Public
Notices were issued on the dates indicated. The Notices can be downloaded from
the links below:
The following
information and presentation materials have been made available on the dates indicated:
REPORTS
Upon completion
of the Master Plan Class Environmental Assessment, a Project File Report will
be made available in this space. The anticipated timing of the release of this
report is Spring / Summer 2019.
PROJECT CONTACTS
The Study Team is interested in receiving any comments or input that you
may have about the Study. Material will be maintained on file for use during
the study and may be included in study documentation. Should you have any
questions or comments, require further information, or wish to be added to the
study mailing list, please contact the following:
Consultant:
Kevin Brown, P.Eng
The Municipal Infrastructure Group Ltd
8800 Dufferin Street, Suite 200
Vaughan, ON.
L4K 0C5
Phone: (905) 738-5700 x247
Fax: (905) 738-0065
King Township:
Wayne Pinkney - Project Manager
King Township, Engineering and Public Works
2585 King Road
King City, ON.
L7B 1A1
Email: wpinkney@king.ca
Phone: (905) 833-4575